Mariana Lake Grading & Bridge Culverts
This project consisted of grading, bridge culverts and other work north of Mariana Lake.
View ProjectWandering River Concrete Girder Bridge
This project consisted of construction of a precast concrete girder bridge and other work.
View ProjectThis project consisted of site preparation, earthworks excavation and fill, storm water pond and gravity drain construction.
View ProjectThis project consisted of 64 km of new access road construction and 5 bridges on the Dover West access road.
View ProjectThis project consisted of grade widening, re-surfacing, installation of geogrid and geotextiles and drainage improvements on the South Canterra Road.
View ProjectKirby In-Situ Oil Sands Project
This project consisted of initial site development including stripping, common excavation, liner installation, culvert installation, access roads and plant site grading.
View ProjectThis project consisted of CPF rough grading, roads, underground, gravel placement, paving completion, pad construction and tank farm construction.
View ProjectKearl - Athabasca Field Program
This project consisted of the clearing and freezing down of Kearl, Syncrude & Firebag.
View ProjectEast Athabasca Highway and Bridges
This project consisted of construction of the East Athabasca Highway including several bridges and bridge culverts.
View ProjectSuncor Firebag Stage 3+ Aerodrome & Access Road
This project consisted of aerodrome construction, muskeg stripping, access roads, ditching, geotextiles, topsoil placement & seeding.
View ProjectSuncor Firebag Stage 3+ Firebag Village
This project consisted of new campsite construction, muskeg stripping, roads, ditching, geotextiles and granular surfacing.
View ProjectSuncor Firebag Well Pads 105, 106 & Access Road
This project consisted of the construction of 2 well pads and 2.6 km of access roads within Suncor Firebag Stage 3+.
View ProjectSuncor Firebag Well Pads 107, 108 & Access Road
This project consisted of the construction of 2 well pads and access road within Suncor Firebag Stage 3+.
View ProjectSuncor Firebag Stage 3+ Plant 93 Expansion
This project consisted of new plant construction, including muskeg stripping, roads, ditching, geotextiles, well pads, settling ponds and berms.
View ProjectNexen Well Pad 9111 & Access Road
Construction of Well Pad 9111 including Access Road and Flow Lines. Musket removal, stripping topsoil zones and cut to fill.
View ProjectPlant 300 Access Road from Steepbank Trail
This project consisted of the construction of 2.4 km of access road to Plant 300 as well as Well Pad accesses.
View ProjectSunrise Thermal Project - Early site Development
This project consisted of Muskeg removal and stockpile at the Husky Sunrise Thermal Project.
View ProjectMacKay River Landfill Phase II Cell Expansion
This project consisted of construction of two landfill cells including a leachate / underdrain system, 80mil HDPE liner and granular fill drainage system.
View ProjectJackpine Mine AOSP Upstream Expansion Project
This project consisted of construction of a ditching and drainage system with armored Drop Structures at Albian Sands Jackpine mine.
View ProjectThis project consisted of excavating and placement of engineered fill for the recycle pond at CNRL.
View ProjectAerodrome Access Roads & Gravel Pit
This project consisted of the design and construction of 9.5 kms of heavy haul road, 4.5 kms of access road, and 1 major bridge structure.
View ProjectThis project consisted of the design and construction of 3.3 kms of access road to the Horizon plant-site.