Featured Projects

TBCLP has the industry experience and expertise to complete multiple large scale projects on-time and on-budget. We are among the best in the industry and provide innovative solutions to our client’s needs.

Town of Tofield 54th Ave Infrastructure

This project consisted of installing new services and maintaining essential services to existing homes during construction.

View Project

City of Edmonton 178th Street Infrastructure

This project consisted of the removal of old services and installation of new stormwater infrastructure for the City of Edmonton.

View Project

City of Edmonton 156th Street Infrastructure

This project consisted of complete removal of infrastructure and new installations on an active arterial road.

View Project

Kearl - MPAR

This project consisted of the re-routing of the Main Plant Access Road (MPAR) .

View Project

Carmon Creek

This project consisted of site excavation, preparation, and culvert installation north-east of Peace River.

View Project

Mariana Lake Grading & Bridge Culverts

This project consisted of grading, bridge culverts and other work north of Mariana Lake.

View Project

Wandering River Concrete Girder Bridge

This project consisted of construction of a precast concrete girder bridge and other work.

View Project

West Ells CPF Earthworks

This project consisted of site preparation, earthworks excavation and fill, storm water pond and gravity drain construction.

View Project

Dover West Access Road

This project consisted of 64 km of new access road construction and 5 bridges on the Dover West access road.

View Project

Kearl - South Canterra Road

This project consisted of grade widening, re-surfacing, installation of geogrid and geotextiles and drainage improvements on the South Canterra Road.

View Project

Kirby In-Situ Oil Sands Project

This project consisted of initial site development including stripping, common excavation, liner installation, culvert installation, access roads and plant site grading.

View Project

Sunrise Phase 1

This project consisted of CPF rough grading, roads, underground, gravel placement, paving completion, pad construction and tank farm construction.

View Project

Kearl - Athabasca Field Program

This project consisted of the clearing and freezing down of Kearl, Syncrude & Firebag.

View Project

East Athabasca Highway and Bridges

This project consisted of construction of the East Athabasca Highway including several bridges and bridge culverts.

View Project

Suncor Firebag Stage 3+ Aerodrome & Access Road

This project consisted of aerodrome construction, muskeg stripping, access roads, ditching, geotextiles, topsoil placement & seeding.

View Project

Suncor Firebag Stage 3+ Firebag Village

This project consisted of new campsite construction, muskeg stripping, roads, ditching, geotextiles and granular surfacing.

View Project

Suncor Firebag Well Pads 105, 106 & Access Road

This project consisted of the construction of 2 well pads and 2.6 km of access roads within Suncor Firebag Stage 3+.

View Project

Suncor Firebag Well Pads 107, 108 & Access Road

This project consisted of the construction of 2 well pads and access road within Suncor Firebag Stage 3+.

View Project

Suncor Firebag Stage 3+ Plant 93 Expansion

This project consisted of new plant construction, including muskeg stripping, roads, ditching, geotextiles, well pads, settling ponds and berms.

View Project

Nexen Well Pad 9111 & Access Road

Construction of Well Pad 9111 including Access Road and Flow Lines. Musket removal, stripping topsoil zones and cut to fill.

View Project

Plant 300 Access Road from Steepbank Trail

This project consisted of the construction of 2.4 km of access road to Plant 300 as well as Well Pad accesses.

View Project

Sunrise Thermal Project - Early site Development

This project consisted of Muskeg removal and stockpile at the Husky Sunrise Thermal Project.

View Project

MacKay River Landfill Phase II Cell Expansion

This project consisted of construction of two landfill cells including a leachate / underdrain system, 80mil HDPE liner and granular fill drainage system.

View Project

Jackpine Mine AOSP Upstream Expansion Project

This project consisted of construction of a ditching and drainage system with armored Drop Structures at Albian Sands Jackpine mine.

View Project