Featured Projects

TBCLP has the industry experience and expertise to complete multiple large scale projects on-time and on-budget. We are among the best in the industry and provide innovative solutions to our client’s needs.

Suncor Firebag Stage 3+ Aerodrome & Access Road

This project consisted of aerodrome construction, muskeg stripping, access roads, ditching, geotextiles, topsoil placement & seeding.

View Project

Suncore Firebag Stage 3+ Firebag Village

This project consisted of new campsite construction, muskeg stripping, roads, ditching, geotextiles and granular surfacing.

View Project

Suncor Firebag Well Pads 105, 106 & Access Road

This project consisted of the construction of 2 well pads and 2.6 km of access roads within Suncor Firebag Stage 3+.

View Project

Suncor Firebag Well Pads 107, 108 & Access Road

This project consisted of the construction of 2 well pads and access road within Suncor Firebag Stage 3+.

View Project

Suncor Firebag Stage 3+ Plant 93 Expansion

This project consisted of new plant construction, including muskeg stripping, roads, ditching, geotextiles, well pads, settling ponds and berms.

View Project

Nexen Well Pad 9111 & Access Road

Construction of Well Pad 9111 including Access Road and Flow Lines. Musket removal, stripping topsoil zones and cut to fill.

View Project

Plant 300 Access Road from Steepbank Trail

This project consisted of the construction of 2.4 km of access road to Plant 300 as well as Well Pad accesses.

View Project

Sunrise Thermal Project - Early site Development

This project consisted of Muskeg removal and stockpile at the Husky Sunrise Thermal Project.

View Project

MacKay River Landfill Phase II Cell Expansion

This project consisted of construction of two landfill cells including a leachate / underdrain system, 80mil HDPE liner and granular fill drainage system.

View Project

Jackpine Mine AOSP Upstream Expansion Project

This project consisted of construction of a ditching and drainage system with armored Drop Structures at Albian Sands Jackpine mine.

View Project

Horizon Project Recycle Pond

This project consisted of excavating and placement of engineered fill for the recycle pond at CNRL.

View Project

Aerodrome Access Roads & Gravel Pit

This project consisted of the design and construction of 9.5 kms of heavy haul road, 4.5 kms of access road, and 1 major bridge structure.

View Project

CNRL Phase 1 Access Road

This project consisted of the design and construction of 3.3 kms of access road to the Horizon plant-site.

View Project