Featured Projects
TBCLP has the industry experience and expertise to complete multiple large scale projects on-time and on-budget. We are among the best in the industry and provide innovative solutions to our client’s needs.
Suncor Firebag Stage 3+ Aerodrome & Access Road
This project consisted of aerodrome construction, muskeg stripping, access roads, ditching, geotextiles, topsoil placement & seeding.
View ProjectSuncore Firebag Stage 3+ Firebag Village
This project consisted of new campsite construction, muskeg stripping, roads, ditching, geotextiles and granular surfacing.
View ProjectSuncor Firebag Well Pads 105, 106 & Access Road
This project consisted of the construction of 2 well pads and 2.6 km of access roads within Suncor Firebag Stage 3+.
View ProjectSuncor Firebag Well Pads 107, 108 & Access Road
This project consisted of the construction of 2 well pads and access road within Suncor Firebag Stage 3+.
View ProjectSuncor Firebag Stage 3+ Plant 93 Expansion
This project consisted of new plant construction, including muskeg stripping, roads, ditching, geotextiles, well pads, settling ponds and berms.
View ProjectNexen Well Pad 9111 & Access Road
Construction of Well Pad 9111 including Access Road and Flow Lines. Musket removal, stripping topsoil zones and cut to fill.
View ProjectPlant 300 Access Road from Steepbank Trail
This project consisted of the construction of 2.4 km of access road to Plant 300 as well as Well Pad accesses.
View ProjectSunrise Thermal Project - Early site Development
This project consisted of Muskeg removal and stockpile at the Husky Sunrise Thermal Project.
View ProjectMacKay River Landfill Phase II Cell Expansion
This project consisted of construction of two landfill cells including a leachate / underdrain system, 80mil HDPE liner and granular fill drainage system.
View ProjectJackpine Mine AOSP Upstream Expansion Project
This project consisted of construction of a ditching and drainage system with armored Drop Structures at Albian Sands Jackpine mine.
View ProjectThis project consisted of excavating and placement of engineered fill for the recycle pond at CNRL.
View ProjectAerodrome Access Roads & Gravel Pit
This project consisted of the design and construction of 9.5 kms of heavy haul road, 4.5 kms of access road, and 1 major bridge structure.
View ProjectThis project consisted of the design and construction of 3.3 kms of access road to the Horizon plant-site.
View Project